Customization: | Available |
---|---|
After-sales Service: | 1 Year China Local |
Application: | Container House |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description
Product information
Factory direct sales/support customization based on drawings.
External dimensions (mm) | 5800*2480*2560 |
Internal dimensions (mm) | 5640*2320*2400 |
Folded state (mm) | 5800*2480*360 |
Total mass (kg) | 850-1100kg |
Top main beam materials | Q235B 80×40×1.5mm |
Bottom main beam materials | Q235B 80×60×1.5mm |
Front and rear main beams | Q235B 80×40×1.5mm |
Hanging head | Q235B 125*200*(4mm) |
Folding hinge | 13mm Galvanized hinge 13mm |
Overall frame protective coating | Electrostatic spray/high gloss white |
External roof | 0.4mm Galvanized sheet 0.4mm |
Internal suspended ceiling | Upgraded materials and styling (easier to drain water) |
Thermal insulation cotton | Thermal insulation cotton 50mm |
Sidewall | 65/0.25 mm composite board (insulation cotton) |
Front and rear walls | 65/0.25mm composite board (insulation cotton) |
Floor | 15mm floor + 1.6mm lino |
Electrical System | Configure according to the style provided by the customer. |
Ordinary security door | Security door (warm white) size: 930mm*1970mm |
Windows | 930*930mm anti-theft windows (warm white) plus free screens |
Roof weighing | 1.0KN/m² |
wall pressure | 0.5KN/m² |
Main features of prefabricated cabins:
The fully prefabricated cabin substation has changed the traditional electrical system layout, civil engineering design and construction mode of the substation. The substation is constructed through two stages of factory production prefabrication and on-site installation. Its standardized design, modular combination, industrialized production, and intensive construction make substation construction a road with high content, less environmental pollution, and refined construction.
1. In terms of civil engineering: the layout of the traditional monthly electrical system has been improved, and the principles of building energy saving, material saving, water saving, and land saving have been implemented, and the building structure has been made light. The construction period has been shortened by using the on-site fast splicing technology and changing the construction serial process .
2. Electrical aspects: six standard systems need to be formulated for general substation design, component processing details, factory production process, on-site splicing process, construction fee quota, and prefabricated construction control.
3. The construction mode of fully prefabricated substation requires modern prefabricated parts and steel component factories as support, changing the redefinition of the traditional mode.
Prefabricated cabin is a new technology for the development of electric power facilities in my country, and the prefabricated cabin with metal welded structure (container prefabricated cabin box transformer) has become an important part of electric power development.